HomeCategory

Building and Infrastructure

This project is defined as the management, design, material, labor, and equipment to construct and/or refurbish all utilities, buildings, road construction, force protection measures, job site security, and demining activities. This project could be counted Sambros International great achievement showing our capabilities to accomplish the work assigned in remote and hostile environments such as Yahya-khail in Paktika province. Despite the security and other challenges to supply necessary materials to the job site, we were able to get the job done on-time and in full compliance to the specification and so provided by the government. To answer possible security threats, a group of security forces involving 46 people were appointed to ensure job site security as well as safe supply of the required construction materials.

Agriculture Institute Building Baghlan, Helmand Provinces

This $1,200,000.00  project is for the  Design  and Build  of Agriculture Institute Building  Baghlan, Helmand Provinces  Afghanistan, The project is illustrated as Design and Build of including, Baghlan, Helmand  Provinces of Afghanistan, and other infrastructures for 400 personnel to include: Design ,Build and Force Protection Measures. Within days of the NTP issued on (20 July 2006) Sambros International Inc was able to get approval of the master plan. The design was final 100% to facilitate the most efficient schedules for mobilization and force protection.

The critical items needed to start our construction were either secured from our Kabul stock or air freighted from various suppliers. Within 1 August 2006 Sambros International Inc. started construction work on all the foundations. We were able to start construction even though our convoys were delayed by weeks and regularly attacked. SII supervisors are devoting their time and efforts for high quality construction work on the job site and closely in touched with QAR assigned from the Government site for better.

As referenced above, the work in this contract included survey, design, and construction of 12.5 Km Ahmad Abad to Gardiz road and other pertinent structures. Similarly, survey and design was performed and comprehensive quality control, safety, and risk management plans were prepared by our professional engineers and submitted for review and approval from the client. After approval of the necessary plans and design documents, the actual construction phase begins. Considering the existing realities on the ground, tight security measures were taken to provide safe working environment for all personnel involved in this project. Furthermore, strong collaboration between the Afghan National Army and police was essential to avoid any terrorist activities around the project site which could have impaired or hampered the work progress. Despite all, the construction work was accomplished on-time with full satisfaction of the client according to the specification and scope of work.